﻿<?xml version="1.0" encoding="utf-8"?>
<!--<!DOCTYPE nitf SYSTEM "nitf-3-4.dtd">-->
<nitf>
  <head>
    <title id="Title">#Title</title>
    <docdata management-doc-idref="">
      <date.issue id="CreationDate" norm="" />
      <du-key id="rev-ver" generation="1" version="Default" />
      <du-key id="Parent-Version" version="" />
      <identified-content>
        <classifier id="newspro-nitf" value="r2" />
        <classifier id="Newspro-App" value="Epaper" />
        <classifier id="Content-Type" value="Story" />
        <classifier id="storyID" value="" />
        <classifier id="CmsConID" value="" />
        <classifier id="Desk" value="" />
        <classifier id="Source" value="" />
        <classifier id="Edition" value="" />
        <classifier id="Category" value="-1" />
        <classifier id="UserName" value="" />
        <classifier id="PublicationDate" value="30/09/2026" />
        <classifier id="PublicationName" value="HI" />
        <classifier id="IsPublished" value="Y" />
        <classifier id="IsPlaced" value="Y" />
        <classifier id="IsCompleated" value="N" />
        <classifier id="IsProofed" value="N" />
        <classifier id="User" value="" />
        <classifier id="Headline-Count" value="" />
        <classifier id="Slug-Count" value="0" />
        <classifier id="Photo-Count" value="0" />
        <classifier id="Caption-Count" value="0" />
        <classifier id="Word-Count" value="0" />
        <classifier id="Character-Count" value="0" />
        <classifier id="Location" value="" />
        <classifier id="TemplateType" value="1" />
        <classifier id="StoryType" value="Story" />
        <classifier id="Author" value="" />
        <classifier id="UOM" value="mm" />
        <classifier id="NumCol" value="0" />
        <classifier id="kicker" value="" />
        <classifier id="ByLine" value="" />
        <classifier id="DateLine" value="" />
        <classifier id="box-geometry" value="36,81,372,561" />
        <classifier id="Layer" value="Default" />
        <classifier id="numcol" value="3" />
        <classifier id="ArticleStyle" value="" />
        <classifier id="Epaper-Build" value="7.96.0.0" />
        <classifier id="ProcessingDateTime" value="Tue Sep 29 2026 22:54:01 GMT+0530" />
      </identified-content>
      <urgency id="home-page" ed-urg="0" />
      <urgency id="priority" ed-urg="0" />
      <doc-scope id="scope" value="0" />
    </docdata>
    <pubdata type="print" name="HI" date.publication="20260930T000000+5.30" edition.name="VSP" edition.area="VSP" position.section="30MAIN05FVSP" position.sequence="5" ex-ref="30MAIN05FVSP.indd" />
  </head>
  <body boxBorderWeightColor="" boxBorderWeight="">
    <body.head>
      <hedline>
        <hl1 id="Headline1" class="1" style="Headline1">
          <lang class="3" style="Headline1" font="Chronicle Display" fontStyle="Roman" size="45">Gate Bazaar flyover faces safety test</lang>
        </hl1>
      </hedline>
    </body.head>
    <body.content id="Bodytext" CaptionAsBody="0">
      <block>
        <media id="1" media-type="image">
          <media-reference id="tn" source-credit="" data-location="1" source="2ndLEAD_5_VSP_tn.jpg" Units="pixels" width="50" height="50"></media-reference>
        </media>
      </block>
      <p style=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Minion Pro" fontStyle="Regular" size="9">Sunil Mohan Patnaik 
Brahmapur</lang>
      </p>
      <p style=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Minion Pro" fontStyle="Regular" size="9">Anexpert nine-member technical team, led by Superintending Engineer Pinaki Prasad Swain of Brahmapur Quality Control Division, on Monday began a detailed inspection of the under-construction Gate Bazaar flyover following allegations of substandard construction work and use of inferior-quality materials.</lang>
      </p>
      <p style=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Minion Pro" fontStyle="Regular" size="9">The team, comprising the Superintending Engineer, SDO, JE and other technical personnel, inspected various components of the flyover and began collecting samples of construction materials, including cement and steel. The team is also inspecting the dimensions and specifications of different structural components to ascertain whether the work conforms to prescribed technical standards.
</lang>
      </p>
      <p style=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Minion Pro" fontStyle="Regular" size="9">The inspection follows a letter written by Brahmapur MP Pradip Panigrahi to Chief Minister Mohan Charan Majhi on July 25, seeking an expert-level investigation into the alleged use of low-quality construction materials and the delay in completion of the flyover.</lang>
      </p>
      <p style=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Minion Pro" fontStyle="Regular" size="9">Panigrahi had alleged that inferior-quality cement, steel and other materials were being used in the project and that managerial difficulties were contributing to delays. The prolonged construction work has also been causing considerable traffic congestion in Gate Bazaar and affecting the business activities of local traders.</lang>
      </p>
      <p style=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Minion Pro" fontStyle="Regular" size="9">Speaking during the inspection, SE Pinaki Prasad Swain said the technical investigation would take a few days. “We are collecting samples from every pillar and slab and inspecting the dimensions of the various components used in the flyover. The samples will be tested and evaluated as per prescribed procedures. The findings will be compiled and a report will be submitted to the State government,” he said.</lang>
      </p>
      <p style=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Minion Pro" fontStyle="Regular" size="9">The technical scrutiny has now put the quality and progress of the much-awaited project under close examination, with all eyes on the findings of the expert committee.</lang>
      </p>
      <p style=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Minion Pro" fontStyle="Regular" size="9">The 1,136-metre-long flyover, connecting Niladri Vihar on Aska Road with the City Hospital Old Gate, is intended to ease traffic congestion in one of Brahmapur’s busiest stretches. The project was formally inaugurated on August 29, 2025, whileactual construction commenced on January 15, 2025.</lang>
      </p>
    </body.content>
  </body>
</nitf>